Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.
Réglementation et droit · 04/10/20001 min de lecture
Grain-Oriented Electrical Steel From Italy: Notice of Extension of Time Limit for Final Results of Antidumping Administrative Review
Traduction automatique locale · Langue originale de la source
Résumé
The Department of Commerce (the Department) is extending the time limit for the final results of the antidumping duty administrative review of grain-oriented electrical steel (GOES) from Italy. The period of review is August 1, 1998 through July 31, 1999.
Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →