能源与环境 · 1995/6/151 分钟阅读
Real-Time Information Networks; Order on Motions for Extension of Time for Filing Preliminary Comments
本地自动翻译 · 来源原始语言
摘要
On March 29, 1995, the Federal Energy Regulatory Commission issued a notice of technical conference and request for comments (60 FR 17726, Apr. 7, 1995) to announce a technical conference to be scheduled at a later date, and, in preparation for that conference, to request comments on: Whether real-time information networks (RINS) or some other option is the best method to ensure that potential purchasers of transmission services receive access to information to enable them to obtain open access transmission service on a non-discriminatory basis from public utilities that own and/or control facilities used for the transmission of electric energy in interstate commence; and what standards should be adopted if the Commission requires such public utilities to institute RINS systems. By this order, the Commission grants an extension of time for filing preliminary comments.