BN Business News
Aggiungi la tua azienda →
Questa traduzione è in preparazione. Nel frattempo mostriamo temporaneamente la versione originale in inglese.

Energia e ambiente · 15/06/19951 min di lettura

Real-Time Information Networks; Order on Motions for Extension of Time for Filing Preliminary Comments

Traduzione automatica locale · Lingua originale della fonte

Riepilogo

On March 29, 1995, the Federal Energy Regulatory Commission issued a notice of technical conference and request for comments (60 FR 17726, Apr. 7, 1995) to announce a technical conference to be scheduled at a later date, and, in preparation for that conference, to request comments on: Whether real-time information networks (RINS) or some other option is the best method to ensure that potential purchasers of transmission services receive access to information to enable them to obtain open access transmission service on a non-discriminatory basis from public utilities that own and/or control facilities used for the transmission of electric energy in interstate commence; and what standards should be adopted if the Commission requires such public utilities to institute RINS systems. By this order, the Commission grants an extension of time for filing preliminary comments.

Lingua originale della fonte: Federal Register — Federal Energy Regulatory CommissionApri il comunicato originale →

Esplora gli approfondimenti

Analisi aziendali →