BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Énergie et environnement · 15/06/19951 min de lecture

Real-Time Information Networks; Order on Motions for Extension of Time for Filing Preliminary Comments

Traduction automatique locale · Langue originale de la source

Résumé

On March 29, 1995, the Federal Energy Regulatory Commission issued a notice of technical conference and request for comments (60 FR 17726, Apr. 7, 1995) to announce a technical conference to be scheduled at a later date, and, in preparation for that conference, to request comments on: Whether real-time information networks (RINS) or some other option is the best method to ensure that potential purchasers of transmission services receive access to information to enable them to obtain open access transmission service on a non-discriminatory basis from public utilities that own and/or control facilities used for the transmission of electric energy in interstate commence; and what standards should be adopted if the Commission requires such public utilities to institute RINS systems. By this order, the Commission grants an extension of time for filing preliminary comments.

Langue originale de la source: Federal Register — Federal Energy Regulatory CommissionOuvrir le communiqué original →

Explorer les analyses

Analyses business →