BN Business News
Şirketinizi ekleyin →
Bu çeviri hazırlanıyor. Bu süre içinde İngilizce orijinal sürümü gösteriyoruz.

Düzenleme ve hukuk · 08.07.20211 dk okuma

Revised Notice of Intent/Revised Project Action and Notice of Availability for Land Ports of Entry (LPOE)

Yerel otomatik çeviri · Kaynağın orijinal dili

Özet

GSA has prepared a Final Environmental Assessment (EA) and separate Finding of No Significant Impact (FONSI) which analyzed the potential impacts from the proposed construction of the Federal Motor Carrier Safety Administration (FMCSA) standalone bus inspection facility at the San Ysidro Land Port of Entry (LPOE) in San Diego, California. The two alternatives analyzed include: New "Basic" Facility Buildout; No Build Action. GSA is advising the public that the Final EA and FONSI are available for public comment.

Kaynağın orijinal dili: Federal Register — General Services AdministrationOrijinal duyuruyu açın →