BN Business News
会社を追加 →
この記事の翻訳を準備しています。それまでの間、英語の原文を表示します。

規制と法律 · 2021/7/81 分で読めます

Revised Notice of Intent/Revised Project Action and Notice of Availability for Land Ports of Entry (LPOE)

ローカル自動翻訳 · 情報源の原言語

概要

GSA has prepared a Final Environmental Assessment (EA) and separate Finding of No Significant Impact (FONSI) which analyzed the potential impacts from the proposed construction of the Federal Motor Carrier Safety Administration (FMCSA) standalone bus inspection facility at the San Ysidro Land Port of Entry (LPOE) in San Diego, California. The two alternatives analyzed include: New "Basic" Facility Buildout; No Build Action. GSA is advising the public that the Final EA and FONSI are available for public comment.

情報源の原言語: Federal Register — General Services Administration原文の発表を開く →

関連インサイト

ビジネスインサイト →