Regelgeving en recht · 8-7-20211 min lezen
Revised Notice of Intent/Revised Project Action and Notice of Availability for Land Ports of Entry (LPOE)
Lokale automatische vertaling · Oorspronkelijke brontaal
Samenvatting
GSA has prepared a Final Environmental Assessment (EA) and separate Finding of No Significant Impact (FONSI) which analyzed the potential impacts from the proposed construction of the Federal Motor Carrier Safety Administration (FMCSA) standalone bus inspection facility at the San Ysidro Land Port of Entry (LPOE) in San Diego, California. The two alternatives analyzed include: New "Basic" Facility Buildout; No Build Action. GSA is advising the public that the Final EA and FONSI are available for public comment.