Bu çeviri hazırlanıyor. Bu süre içinde İngilizce orijinal sürümü gösteriyoruz.
Düzenleme ve hukuk · 21.12.19981 dk okuma
Oil Country Tubular Goods from Korea: Extension of Time Limit for Final Results of the Antidumping Duty Administrative Review
Yerel otomatik çeviri · Kaynağın orijinal dili
Özet
The Department of Commerce (``the Department'') is extending the time limit for the preliminary results for the second review of oil country tubular goods from Korea. This review covers the period August 1, 1996 through July 31, 1997. The extension is made pursuant to section 751(a)(3)(A) of the Tariff Act of 1930, as amended.
Kaynağın orijinal dili: Federal Register — All DocumentsOrijinal duyuruyu açın →