Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.
Réglementation et droit · 21/12/19981 min de lecture
Oil Country Tubular Goods from Korea: Extension of Time Limit for Final Results of the Antidumping Duty Administrative Review
Traduction automatique locale · Langue originale de la source
Résumé
The Department of Commerce (``the Department'') is extending the time limit for the preliminary results for the second review of oil country tubular goods from Korea. This review covers the period August 1, 1996 through July 31, 1997. The extension is made pursuant to section 751(a)(3)(A) of the Tariff Act of 1930, as amended.
Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →