Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.
Regulación y derecho · 21/12/19981 min de lectura
Oil Country Tubular Goods from Korea: Extension of Time Limit for Final Results of the Antidumping Duty Administrative Review
Traducción automática local · Idioma original de la fuente
Resumen
The Department of Commerce (``the Department'') is extending the time limit for the preliminary results for the second review of oil country tubular goods from Korea. This review covers the period August 1, 1996 through July 31, 1997. The extension is made pursuant to section 751(a)(3)(A) of the Tariff Act of 1930, as amended.
Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →