Энергетика и окружающая среда · 27.07.20171 мин чтения
South Carolina Electric & Gas Company, South Carolina Public Service Authority; Virgil C. Summer Nuclear Station, Units 2 and 3, Inspections, Tests, Analyses, and Acceptance Criteria
Локальный автоматический перевод · Язык оригинального источника
Краткое содержание
The U.S. Nuclear Regulatory Commission (NRC) has determined that the inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met for the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3.