Energía y medio ambiente · 27/7/20171 min de lectura
South Carolina Electric & Gas Company, South Carolina Public Service Authority; Virgil C. Summer Nuclear Station, Units 2 and 3, Inspections, Tests, Analyses, and Acceptance Criteria
Traducción automática local · Idioma original de la fuente
Resumen
The U.S. Nuclear Regulatory Commission (NRC) has determined that the inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met for the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3.