الطاقة والبيئة · 27/7/20171 دقائق للقراءة
South Carolina Electric & Gas Company, South Carolina Public Service Authority; Virgil C. Summer Nuclear Station, Units 2 and 3, Inspections, Tests, Analyses, and Acceptance Criteria
ترجمة آلية محلية · اللغة الأصلية للمصدر
الملخص
The U.S. Nuclear Regulatory Commission (NRC) has determined that the inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met for the Virgil C. Summer Nuclear Station (VCSNS), Units 2 and 3.