Regulação e direito · 29/09/19971 min de leitura

Central Valley Project and California-Oregon Transmission ProjectWAPA-77

Tradução automática local · Idioma original da fonte

Resumo

Notice is given of the confirmation and approval by the Deputy Secretary of the Department of Energy (DOE) of Rate Order No. WAPA-77 and Rate Schedules CV-F9, CV-FT3, CV-NFT3, CV-TPT4, CV-NWT1, CV-PSS1, CV-RFS1, CV-EID1, CV-SPR1, CV-SUR1, COTP-FT1, and COTP-NFT1 placing provisional rates for the Central Valley Project (CVP) commercial firm power and transmission services, power scheduling service, and ancillary services of the Western Area Power Administration (Western), and placing provisional rates for the California-Oregon Transmission Project (COTP) transmission services into effect on an interim basis. The provisional rates, will remain in effect on an interim basis until the Federal Energy Regulatory Commission (FERC) confirms, approves, and places them into effect on a final basis or until they are replaced by other rates. The provisional rates will provide sufficient revenue to pay all annual costs, including interest expense, and repayment of required investment within the allowable period.

Idioma original da fonte: Federal Register — All DocumentsAbrir o comunicado original →

Explorar análises

Análises empresariais →