التنظيم والقانون · 29/9/19971 دقائق للقراءة
Central Valley Project and California-Oregon Transmission ProjectWAPA-77
ترجمة آلية محلية · اللغة الأصلية للمصدر
الملخص
Notice is given of the confirmation and approval by the Deputy Secretary of the Department of Energy (DOE) of Rate Order No. WAPA-77 and Rate Schedules CV-F9, CV-FT3, CV-NFT3, CV-TPT4, CV-NWT1, CV-PSS1, CV-RFS1, CV-EID1, CV-SPR1, CV-SUR1, COTP-FT1, and COTP-NFT1 placing provisional rates for the Central Valley Project (CVP) commercial firm power and transmission services, power scheduling service, and ancillary services of the Western Area Power Administration (Western), and placing provisional rates for the California-Oregon Transmission Project (COTP) transmission services into effect on an interim basis. The provisional rates, will remain in effect on an interim basis until the Federal Energy Regulatory Commission (FERC) confirms, approves, and places them into effect on a final basis or until they are replaced by other rates. The provisional rates will provide sufficient revenue to pay all annual costs, including interest expense, and repayment of required investment within the allowable period.