BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Regulación y derecho · 29/9/19971 min de lectura

Central Valley Project and California-Oregon Transmission ProjectWAPA-77

Traducción automática local · Idioma original de la fuente

Resumen

Notice is given of the confirmation and approval by the Deputy Secretary of the Department of Energy (DOE) of Rate Order No. WAPA-77 and Rate Schedules CV-F9, CV-FT3, CV-NFT3, CV-TPT4, CV-NWT1, CV-PSS1, CV-RFS1, CV-EID1, CV-SPR1, CV-SUR1, COTP-FT1, and COTP-NFT1 placing provisional rates for the Central Valley Project (CVP) commercial firm power and transmission services, power scheduling service, and ancillary services of the Western Area Power Administration (Western), and placing provisional rates for the California-Oregon Transmission Project (COTP) transmission services into effect on an interim basis. The provisional rates, will remain in effect on an interim basis until the Federal Energy Regulatory Commission (FERC) confirms, approves, and places them into effect on a final basis or until they are replaced by other rates. The provisional rates will provide sufficient revenue to pay all annual costs, including interest expense, and repayment of required investment within the allowable period.

Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →