BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

비즈니스 · 2024. 6. 21.1 분 읽기

Notice of Final Federal Agency Actions on Proposed Transportation Project in Florida

로컬 자동 번역 · 원본 출처 언어

요약

The FHWA, on behalf of the FDOT, is issuing this notice to announce actions taken by FDOT and other Federal Agencies that are final agency actions. These actions relate to the proposed S.R. 401 Bridge Replacement Improvements Project Development and Environment (PD&E) Study (Financial Management Number 444787-1). The proposed S.R. 401 Bridge Replacement Improvements Project will improve system linkage and modal interrelationships from 500 feet south of the S.R. 528 bridges to 3,500 feet north of the S.R. 401 bridges to Charles Rowland Drive. The project consists of replacing the existing three bascule bridges over the Canaveral Barge Canal with two parallel three-lane, high-level fixed span concrete bridges. These actions grant licenses, permits, or approvals for the project.

원본 출처 언어: Federal Register — Transportation Department원문 발표 열기 →