BN Business News
Adicionar empresa →
Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.

Negócios · 21/06/20241 min de leitura

Notice of Final Federal Agency Actions on Proposed Transportation Project in Florida

Tradução automática local · Idioma original da fonte

Resumo

The FHWA, on behalf of the FDOT, is issuing this notice to announce actions taken by FDOT and other Federal Agencies that are final agency actions. These actions relate to the proposed S.R. 401 Bridge Replacement Improvements Project Development and Environment (PD&E) Study (Financial Management Number 444787-1). The proposed S.R. 401 Bridge Replacement Improvements Project will improve system linkage and modal interrelationships from 500 feet south of the S.R. 528 bridges to 3,500 feet north of the S.R. 401 bridges to Charles Rowland Drive. The project consists of replacing the existing three bascule bridges over the Canaveral Barge Canal with two parallel three-lane, high-level fixed span concrete bridges. These actions grant licenses, permits, or approvals for the project.

Idioma original da fonte: Federal Register — Transportation DepartmentAbrir o comunicado original →

Explorar análises

Análises empresariais →