BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

에너지 및 환경 · 2026. 4. 8.1 분 읽기

Duke Energy Progress, LLC; H.B. Robinson Steam Electric Plant, Unit No. 2; Exemption

로컬 자동 번역 · 원본 출처 언어

요약

The U.S. Nuclear Regulatory Commission (NRC) has issued an exemption from the regulation that would have required the application for subsequent renewal of Renewed Facility Operating License No. DPR-23 for H.B. Robinson Steam Electric Plant, Unit No. 2 (Robinson) to be referred to the Advisory Committee on Reactor Safeguards for a review and report, with any report being made part of the record of the application and made available to the public, except to the extent that security classification prevents disclosure. Due to this exemption, such referral, review, and report are no longer required.

원본 출처 언어: Federal Register — Nuclear Regulatory Commission원문 발표 열기 →