Energía y medio ambiente · 8/4/20261 min de lectura
Duke Energy Progress, LLC; H.B. Robinson Steam Electric Plant, Unit No. 2; Exemption
Traducción automática local · Idioma original de la fuente
Resumen
The U.S. Nuclear Regulatory Commission (NRC) has issued an exemption from the regulation that would have required the application for subsequent renewal of Renewed Facility Operating License No. DPR-23 for H.B. Robinson Steam Electric Plant, Unit No. 2 (Robinson) to be referred to the Advisory Committee on Reactor Safeguards for a review and report, with any report being made part of the record of the application and made available to the public, except to the extent that security classification prevents disclosure. Due to this exemption, such referral, review, and report are no longer required.