BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

에너지 및 환경 · 2021. 9. 29.1 분 읽기

Florida Power & Light Company; NextEra Energy; St. Lucie Plant, Units Nos. 1 and 2

로컬 자동 번역 · 원본 출처 언어

요약

The U.S. Nuclear Regulatory Commission (NRC) is considering an application for the subsequent license renewal of Renewed Facility Operating License Nos. DPR-67 and NPF-16, which authorize Florida Power & Light Company (FPL or the applicant) to operate St. Lucie Plant (St. Lucie), Unit Nos. 1 and 2. The subsequent renewed operating licenses would authorize the applicant to operate St. Lucie for an additional 20 years beyond the period specified in each of the current renewed licenses. The current renewed operating licenses for St. Lucie expire as follows: Unit 1 on March 1, 2036, and Unit 2 on April 6, 2043. Because this application contains sensitive unclassified non-safeguards information (SUNSI), an order imposes procedures to obtain access to SUNSI for contention preparation.

원본 출처 언어: Federal Register — Nuclear Regulatory Commission원문 발표 열기 →