BN Business News
Adicionar empresa →
Esta tradução está a ser preparada. Entretanto, mostramos temporariamente a versão original em inglês.

Energia e ambiente · 29/09/20211 min de leitura

Florida Power & Light Company; NextEra Energy; St. Lucie Plant, Units Nos. 1 and 2

Tradução automática local · Idioma original da fonte

Resumo

The U.S. Nuclear Regulatory Commission (NRC) is considering an application for the subsequent license renewal of Renewed Facility Operating License Nos. DPR-67 and NPF-16, which authorize Florida Power & Light Company (FPL or the applicant) to operate St. Lucie Plant (St. Lucie), Unit Nos. 1 and 2. The subsequent renewed operating licenses would authorize the applicant to operate St. Lucie for an additional 20 years beyond the period specified in each of the current renewed licenses. The current renewed operating licenses for St. Lucie expire as follows: Unit 1 on March 1, 2036, and Unit 2 on April 6, 2043. Because this application contains sensitive unclassified non-safeguards information (SUNSI), an order imposes procedures to obtain access to SUNSI for contention preparation.

Idioma original da fonte: Federal Register — Nuclear Regulatory CommissionAbrir o comunicado original →

Explorar análises

Análises empresariais →