BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

에너지 및 환경 · 2019. 5. 17.1 분 읽기

Final Interim Staff Guidance DC/COL-ISG-10: Review of Evaluation To Address Adverse Flow Effects in Equipment Other Than Reactor Internals

로컬 자동 번역 · 원본 출처 언어

요약

The Nuclear Regulatory Commission (NRC) is withdrawing its Final Interim Staff Guidance (ISG) DC/COL-ISG-10, "Review of Evaluation to Address Adverse Flow Effects in Equipment Other than Reactor Internals." This ISG served to supplement the guidance provided to the staff in Sections 3.9.2, "Dynamic Testing and Analysis of Systems, Structures, and Components," and 3.9.5, "Reactor Pressure Vessel Internals," of NUREG-0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition," concerning the review of probabilistic risk assessment information and severe accident assessment submitted to support design certification (DC) and combined license (COL) applications. The NRC staff issues ISG to facilitate timely implementation of current staff guidance and to facilitate activities associated with review of applications for DC and COLs by the Office of New Reactors. The NRC staff incorporated the approved DC/COL-ISG into Revision 4 to Sections 3.9.2 and 3.9.5 of NUREG-0800 dated March 2017. With the issuance of Revision 4 to Sections 3.9.2 and 3.9.5 of NUREG-0800, the staff has determined that DC/COL-ISG-10 is no longer necessary and should be

원본 출처 언어: Federal Register — Nuclear Regulatory Commission원문 발표 열기 →