BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

에너지 및 환경 · 2016. 5. 24.1 분 읽기

In the Matter of Entergy Nuclear Operations, Inc., Palisades Nuclear Plant

로컬 자동 번역 · 원본 출처 언어

요약

The U.S. Nuclear Regulatory Commission (NRC) is issuing a Confirmatory Order to Entergy Nuclear Operations, Inc. (Entergy), confirming agreements reached in an Alternative Dispute Resolution Session held on March 25, 2016. As part of the agreement, Entergy will take a number of actions, including: (1) Developing a case study pertaining to the leakage of the Safety Injection Refueling Water Tank at the Palisades Nuclear Plant and training site personnel with an emphasis on lessons learned from the event; (2) sharing facts and lessons learned with the Entergy Fleet and other reactor licensees; (3) reviewing and revising the Entergy corrective action and operability determination procedures to ensure indeterminate and/or changing conditions are addressed, and (4) modifying the current outreach program at Palisades to include wide audience and discussions of the event, plant safety, and current operations.

원본 출처 언어: Federal Register — Nuclear Regulatory Commission원문 발표 열기 →