Enerji ve çevre · 24.05.20161 dk okuma

In the Matter of Entergy Nuclear Operations, Inc., Palisades Nuclear Plant

Yerel otomatik çeviri · Kaynağın orijinal dili

Özet

The U.S. Nuclear Regulatory Commission (NRC) is issuing a Confirmatory Order to Entergy Nuclear Operations, Inc. (Entergy), confirming agreements reached in an Alternative Dispute Resolution Session held on March 25, 2016. As part of the agreement, Entergy will take a number of actions, including: (1) Developing a case study pertaining to the leakage of the Safety Injection Refueling Water Tank at the Palisades Nuclear Plant and training site personnel with an emphasis on lessons learned from the event; (2) sharing facts and lessons learned with the Entergy Fleet and other reactor licensees; (3) reviewing and revising the Entergy corrective action and operability determination procedures to ensure indeterminate and/or changing conditions are addressed, and (4) modifying the current outreach program at Palisades to include wide audience and discussions of the event, plant safety, and current operations.

Kaynağın orijinal dili: Federal Register — Nuclear Regulatory CommissionOrijinal duyuruyu açın →