BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

규제 및 법률 · 2012. 11. 15.2 분 읽기

Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality Planning Purposes; South Carolina; Redesignation of the Charlotte-Gastonia-Rock Hill, North Carolina-South Carolina 1997 8-Hour Ozone Moderate Nonattainment Area to Attainment

로컬 자동 번역 · 원본 출처 언어

요약

On June 1, 2011, the State of South Carolina, through the South Carolina Department of Health and Environmental Control (SC DHEC), submitted a request for EPA to redesignate the portion of York County, South Carolina that is within the bi-state Charlotte-Gastonia- Rock Hill, North Carolina-South Carolina 8-hour ozone nonattainment area (hereafter referred to as the "bi-state Charlotte Area," or "Area") to attainment for the 1997 8-hour ozone national ambient air quality standards (NAAQS); and to approve a State Implementation Plan (SIP) revision containing a maintenance plan for the South Carolina portion of the bi-state Charlotte Area (hereafter referred to as "the York County Area"). The bi-state Charlotte Area consists of Cabarrus, Gaston, Lincoln, Mecklenburg, Rowan, Union and a portion of Iredell County (Davidson and Coddle Creek Townships) in North Carolina; and a portion of York County in South Carolina (including the Catawba Indian Nation reservation lands). EPA is proposing to approve the redesignation request for the York County Area, along with the related SIP revision, including South Carolina's plan for maintaining attainment of the ozone standard in the York County Ar

원본 출처 언어: Federal Register — All Documents원문 발표 열기 →