BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Réglementation et droit · 15/11/20122 min de lecture

Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality Planning Purposes; South Carolina; Redesignation of the Charlotte-Gastonia-Rock Hill, North Carolina-South Carolina 1997 8-Hour Ozone Moderate Nonattainment Area to Attainment

Traduction automatique locale · Langue originale de la source

Résumé

On June 1, 2011, the State of South Carolina, through the South Carolina Department of Health and Environmental Control (SC DHEC), submitted a request for EPA to redesignate the portion of York County, South Carolina that is within the bi-state Charlotte-Gastonia- Rock Hill, North Carolina-South Carolina 8-hour ozone nonattainment area (hereafter referred to as the "bi-state Charlotte Area," or "Area") to attainment for the 1997 8-hour ozone national ambient air quality standards (NAAQS); and to approve a State Implementation Plan (SIP) revision containing a maintenance plan for the South Carolina portion of the bi-state Charlotte Area (hereafter referred to as "the York County Area"). The bi-state Charlotte Area consists of Cabarrus, Gaston, Lincoln, Mecklenburg, Rowan, Union and a portion of Iredell County (Davidson and Coddle Creek Townships) in North Carolina; and a portion of York County in South Carolina (including the Catawba Indian Nation reservation lands). EPA is proposing to approve the redesignation request for the York County Area, along with the related SIP revision, including South Carolina's plan for maintaining attainment of the ozone standard in the York County Ar

Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →

Explorer les analyses

Analyses business →