BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

규제 및 법률 · 2005. 10. 21.1 분 읽기

Georgia Transmission Corporation; Notice of Availability of an Environmental Assessment

로컬 자동 번역 · 원본 출처 언어

요약

Notice is hereby given that the Rural Utilities Service (RUS) proposes to prepare an Environmental Assessment related to possible financial assistance to Georgia Transmission Corporation (GTC) for the construction of approximately 4.4 miles of 230 kilovolt transmission line, a 230/25 kilovolt transmission substation, and a 230 kilovolt switching station. The proposed 230-kilovolt transmission line and substation projects would be located in Gwinnett County, Georgia. GTC is requesting RUS provide financing for the proposed project. A less than 0.1 acre portion of the project will be located in a wetland. Alternatives, including no action, were considered; however, no practicable alternatives were identified that would avoid having an impact on the wetland. Comments or suggestions for mitigating impacts to the wetland are welcome.

원본 출처 언어: Federal Register — All Documents원문 발표 열기 →