Регулирование и право · 21.10.20051 мин чтения
Georgia Transmission Corporation; Notice of Availability of an Environmental Assessment
Локальный автоматический перевод · Язык оригинального источника
Краткое содержание
Notice is hereby given that the Rural Utilities Service (RUS) proposes to prepare an Environmental Assessment related to possible financial assistance to Georgia Transmission Corporation (GTC) for the construction of approximately 4.4 miles of 230 kilovolt transmission line, a 230/25 kilovolt transmission substation, and a 230 kilovolt switching station. The proposed 230-kilovolt transmission line and substation projects would be located in Gwinnett County, Georgia. GTC is requesting RUS provide financing for the proposed project. A less than 0.1 acre portion of the project will be located in a wetland. Alternatives, including no action, were considered; however, no practicable alternatives were identified that would avoid having an impact on the wetland. Comments or suggestions for mitigating impacts to the wetland are welcome.