BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

규제 및 법률 · 2006. 2. 27.1 분 읽기

Notice of Intent to Prepare an Environmental Impact Statement for the Calexico West Port of Entry Expansion/Renovation, Calexico, California

로컬 자동 번역 · 원본 출처 언어

요약

The General Services Administration (GSA) announces its intent to prepare an Environmental Impact Statement (EIS) for the expansion/ renovation of the Calexico West Port of Entry (POE), located in Calexico, California. The purpose of the expansion/renovation is to reduce traffic congestion in Calexico and Mexicali city centers caused by vehicles crossing the border, to improve border security; and to provide safe, secure, and efficient operational areas for the public and Federal employees. This facility serves both vehicular and pedestrian traffic into and out of the Mexican city of Mexicali. The need for this expansion/renovation derives from the substantial increase in its use by international travelers. The existing POE is not equipped to process this increase within an acceptable level of service consistent with the Federal Inspection Service's minimum standards. Problems at the current facility are mostly related to inadequate space for inspection operations, equipment, and personnel. The facility also requires seismic retrofitting. The EIS will address potential environmental impacts of the alternatives for the proposed project related to geology and soils, water resources,

원본 출처 언어: Federal Register — General Services Administration원문 발표 열기 →