BN Business News
Unternehmen hinzufügen →
Diese Übersetzung wird noch vorbereitet. Bis dahin zeigen wir vorübergehend die englische Originalversion.

Regulierung & Recht · 27.2.20061 Min. Lesezeit

Notice of Intent to Prepare an Environmental Impact Statement for the Calexico West Port of Entry Expansion/Renovation, Calexico, California

Lokale automatische Übersetzung · Originalsprache der Quelle

Zusammenfassung

The General Services Administration (GSA) announces its intent to prepare an Environmental Impact Statement (EIS) for the expansion/ renovation of the Calexico West Port of Entry (POE), located in Calexico, California. The purpose of the expansion/renovation is to reduce traffic congestion in Calexico and Mexicali city centers caused by vehicles crossing the border, to improve border security; and to provide safe, secure, and efficient operational areas for the public and Federal employees. This facility serves both vehicular and pedestrian traffic into and out of the Mexican city of Mexicali. The need for this expansion/renovation derives from the substantial increase in its use by international travelers. The existing POE is not equipped to process this increase within an acceptable level of service consistent with the Federal Inspection Service's minimum standards. Problems at the current facility are mostly related to inadequate space for inspection operations, equipment, and personnel. The facility also requires seismic retrofitting. The EIS will address potential environmental impacts of the alternatives for the proposed project related to geology and soils, water resources,

Originalsprache der Quelle: Federal Register — General Services AdministrationOriginalquelle öffnen →

Weitere Themen

Business-Analysen →