이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.
규제 및 법률 · 1999. 10. 26.1 분 읽기
Certain Corrosion-Resistant Carbon Steel Flat Products From Japan: Extension of Time Limit for Final Results of the Antidumping Duty Administrative Review
로컬 자동 번역 · 원본 출처 언어
요약
The Department of Commerce (``the Department'') is extending the time limit for the final results of the review of certain corrosion-resistant carbon steel flat products from Japan. This review covers the period August 1, 1997 through July 31, 1998. The preliminary results of this review were published in the Federal Register on August 16, 1999 (64 FR 44483).
원본 출처 언어: Federal Register — All Documents원문 발표 열기 →