BN Business News
Bedrijf toevoegen →
Deze vertaling wordt voorbereid. Voorlopig tonen we de oorspronkelijke Engelse versie.

Regelgeving en recht · 26-10-19991 min lezen

Certain Corrosion-Resistant Carbon Steel Flat Products From Japan: Extension of Time Limit for Final Results of the Antidumping Duty Administrative Review

Lokale automatische vertaling · Oorspronkelijke brontaal

Samenvatting

The Department of Commerce (``the Department'') is extending the time limit for the final results of the review of certain corrosion-resistant carbon steel flat products from Japan. This review covers the period August 1, 1997 through July 31, 1998. The preliminary results of this review were published in the Federal Register on August 16, 1999 (64 FR 44483).

Oorspronkelijke brontaal: Federal Register — All DocumentsOrigineel bericht openen →