BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

비즈니스 · 1995. 4. 20.1 분 읽기

Sunflower Electric Power Corporation; Finding of No Significant Impact

로컬 자동 번역 · 원본 출처 언어

요약

Notice is hereby given that the Rural Utilities Service (RUS) has made a finding of no significant impact (FONSI) with respect to the potential environmental impact related to the construction and operation of the Fletcher to Pioneer 115 kV Transmission Line Project by Sunflower Electric Power Corporation (Sunflower) of Hays, Kansas. The proposed project is [[Page 19719]] located in Kearny and Grant Counties, Kansas. RUS has concluded that the environmental impacts from the proposed project would not be significant and that the proposed action is not a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required.

원본 출처 언어: Federal Register — Agriculture Department원문 발표 열기 →