BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

商业 · 1995/4/201 分钟阅读

Sunflower Electric Power Corporation; Finding of No Significant Impact

本地自动翻译 · 来源原始语言

摘要

Notice is hereby given that the Rural Utilities Service (RUS) has made a finding of no significant impact (FONSI) with respect to the potential environmental impact related to the construction and operation of the Fletcher to Pioneer 115 kV Transmission Line Project by Sunflower Electric Power Corporation (Sunflower) of Hays, Kansas. The proposed project is [[Page 19719]] located in Kearny and Grant Counties, Kansas. RUS has concluded that the environmental impacts from the proposed project would not be significant and that the proposed action is not a major Federal action significantly affecting the quality of the human environment. Therefore, the preparation of an environmental impact statement is not required.

来源原始语言: Federal Register — Agriculture Department打开原始公告 →

探索专题

商业洞察 →