에너지 및 환경 · 1994. 2. 22.1 분 읽기
Indiana Michigan Power Co.; Donald C. Cook Nuclear Plant Units 1 and 2
로컬 자동 번역 · 원본 출처 언어
요약
Indiana Michigan Power Co.; Donald C. Cook Nuclear Plant Units 1 and 2
에너지 및 환경 · 1994. 2. 22.1 분 읽기
로컬 자동 번역 · 원본 출처 언어
요약
Indiana Michigan Power Co.; Donald C. Cook Nuclear Plant Units 1 and 2
관련 인사이트
비즈니스 인사이트 →관련 비즈니스 신호
6에너지 및 환경 · 2026. 8. 21.
The U.S. Nuclear Regulatory Commission (NRC, the Commission) received and is considering approval of an application filed by Duke Energy Progress, LLC (DEP) and Duke Energy Carolinas, LLC (DEC) on March 20, 2026. The application seeks NRC approval of the direct transfer of Renewed Facility Operating License Nos. DPR-71 and DPR-62 for Brunswick Steam Electric Plant, Units 1 and 2, respectively; Renewed Facility Operating License No. NPF-63 for Shearon Harris Nuclear Power Plant, Unit 1; Subsequent Renewed Facility Operating License No. DPR-23 for H.B. Robinson Steam Electric Plant, Unit 2; and Renewed Materials License No. SNM-2502 for the H.B. Robinson Steam Electric Plant, Unit 2 Independent Spent Fuel Storage Installation, currently held by DEP, to DEC and issuance of conforming license amendments.
요약 읽기 →에너지 및 환경 · 2026. 8. 27.
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of an application filed by NextEra Energy, Inc. (NextEra Energy), Dominion Energy, Inc. (Dominion Energy), Virginia Electric and Power Company (VEPCO), Dominion Energy Nuclear Connecticut (DENC), and Dominion Energy South Carolina, Inc. (DESC) (collectively the Applicants) on July 15, 2026. The application seeks NRC approval of the indirect transfer of the facility operating licenses, materials licenses, and general licenses for Surry Power Station, Unit Nos. 1 and 2 (Surry); North Anna Power Station, Unit Nos. 1 and 2 (North Anna); Virgil C. Summer Nuclear Station, Unit 1 (V.C. Summer); and Millstone Power Station, Units 1, 2, & 3 (Millstone); as well as the combined license for North Anna Unit 3; and the North Anna Early Site Permit. The application contains sensitive unclassified non-safeguards information (SUNSI).
요약 읽기 →에너지 및 환경 · 2026. 8. 28.
The U.S. Nuclear Regulatory Commission (NRC) has issued an exemption in response to a request dated December 31, 2025, from SMR, LLC, on behalf of Palisades SMR, LLC, a wholly-owned subsidiary of Holtec International (collectively, Holtec) for approval to allow construction of permanent support of excavation walls prior to the issuance of a limited work authorization for Pioneer Units 1 and 2. The support of excavation walls will remain in place after construction is complete.
요약 읽기 →에너지 및 환경 · 2026. 8. 26.
The U.S. Nuclear Regulatory Commission (NRC) is providing public notice each week, for four consecutive weeks, of receipt and availability of an application for renewal of early site permit (ESP) ESP-003 for the North Anna ESP site from Virginia Electric and Power Company, doing business as (dba) Dominion Energy Virginia. Renewal of the ESP would allow the licensee to reference ESP-003 in a construction permit (CP) or combined license (COL) application for an additional 20- year period beyond the period specified in the ESP. The location for the North Anna ESP site is in Louisa County, Virginia, and the current ESP-003 expires on November 27, 2027.
요약 읽기 →에너지 및 환경 · 2026. 8. 24.
The U.S. Nuclear Regulatory Commission (NRC, the Commission) is issuing an order approving the application dated April 24, 2026, filed by Arizona Public Service Company (APS), on behalf of Public Service Company of New Mexico (PNM), Troy ParentCo LLC (Troy ParentCo), and their corporate affiliates (together, Applicants). The application sought NRC consent to the indirect transfer of control of PNM's co- ownership of the Renewed Facility Operating License Nos. NPF-41, NPF- 51, and NPF-74 for the Palo Verde Nuclear Generating Station (Palo Verde), Units 1, 2, and 3, respectively, as well as the associated general license for the Palo Verde Independent Spent Fuel Storage Installation (ISFSI) (together, the facility). No physical changes or operational changes to the facility were proposed in the application.
요약 읽기 →에너지 및 환경 · 2026. 9. 11.
도미니언 에너지 버지니아 (Dominion Energy Virginia)가 북아나-site 에서 초기 시트 퍼미트 (Early Site Permit, ESP) 003의 재가입申請을 제출한 것에 대해 미국 원자력 위원회 (U.S. Nuclear Regulatory Commission, NRC)가 고려하는 것. 재가입 허가가 승인되면, 만약 2027년 11월 27일 만료되는 현재 허가의 만료일을 20년 더 지속시킬 수 있을 것이다. 북아나-site는 로위사 카운티 (Louisa County, Virginia)에서 위치하고 있으며, 현재 ESP-003은 2027년 11월 27일 만료된다.
요약 읽기 →