Energia e ambiente · 22/02/19941 min de leitura
Indiana Michigan Power Co.; Donald C. Cook Nuclear Plant Units 1 and 2
Tradução automática local · Idioma original da fonte
Resumo
Indiana Michigan Power Co.; Donald C. Cook Nuclear Plant Units 1 and 2
Energia e ambiente · 22/02/19941 min de leitura
Tradução automática local · Idioma original da fonte
Resumo
Indiana Michigan Power Co.; Donald C. Cook Nuclear Plant Units 1 and 2
Explorar análises
Análises empresariais →Sinais empresariais relacionados
6Energia e ambiente · 25/08/2026
The U.S. Nuclear Regulatory Commission (NRC) is issuing an environmental assessment (EA) and finding of no significant impact (FONSI) for an exemption requested by SMR, LLC on behalf of Palisades SMR, LLC (Palisades SMR), associated with certain excavation support activities for the proposed dual-unit SMR-300 plant, Pioneer Units 1 and 2, at the Palisades Energy Center in Covert, Michigan. Specifically, Palisades SMR is requesting an exemption, pursuant to NRC regulations, to allow for construction of support of excavation (SOE) walls during SMR-300 excavation and prior to issuance of a Limited Work Authorization (LWA), if approved. Based on the analyses presented in the EA, the NRC staff determined that there would be no significant environmental impacts associated with granting the requested exemption.
Ler o resumo →Energia e ambiente · 21/08/2026
The U.S. Nuclear Regulatory Commission (NRC, the Commission) received and is considering approval of an application filed by Duke Energy Progress, LLC (DEP) and Duke Energy Carolinas, LLC (DEC) on March 20, 2026. The application seeks NRC approval of the direct transfer of Renewed Facility Operating License Nos. DPR-71 and DPR-62 for Brunswick Steam Electric Plant, Units 1 and 2, respectively; Renewed Facility Operating License No. NPF-63 for Shearon Harris Nuclear Power Plant, Unit 1; Subsequent Renewed Facility Operating License No. DPR-23 for H.B. Robinson Steam Electric Plant, Unit 2; and Renewed Materials License No. SNM-2502 for the H.B. Robinson Steam Electric Plant, Unit 2 Independent Spent Fuel Storage Installation, currently held by DEP, to DEC and issuance of conforming license amendments.
Ler o resumo →Energia e ambiente · 28/08/2026
The U.S. Nuclear Regulatory Commission (NRC) has issued a one- time exemption to Southern Nuclear Operating Company (SNC), authorizing Vogtle Electric Generating Plant Units 1 and 2 (Vogtle 1 and 2) to retain a single Neutron Source Assembly (NSA) in its current storage cell within a multi-purpose canister ((MPC-32), serial number MPC-707) at the Vogtle Independent Spent Fuel Storage Installation, in a manner that is inconsistent with the loading restrictions specified in Certificate of Compliance (CoC) No. 1014, Amendment 11, for the HI- STORM 100S Version B dry storage system. The exemption allows the NSA to remain in a peripheral basket cell, contrary to Appendix B, Table 2.1-1, which restricts NSA containing assemblies to designated interior cells. The NRC's determination is based on SNC's safety evaluation and supporting analyses demonstrating that the configuration continues to meet applicable safety requirements for criticality control, shielding, thermal performance, structural integrity, and confinement.
Ler o resumo →Energia e ambiente · 27/08/2026
The U.S. Nuclear Regulatory Commission (NRC) received and is considering approval of an application filed by NextEra Energy, Inc. (NextEra Energy), Dominion Energy, Inc. (Dominion Energy), Virginia Electric and Power Company (VEPCO), Dominion Energy Nuclear Connecticut (DENC), and Dominion Energy South Carolina, Inc. (DESC) (collectively the Applicants) on July 15, 2026. The application seeks NRC approval of the indirect transfer of the facility operating licenses, materials licenses, and general licenses for Surry Power Station, Unit Nos. 1 and 2 (Surry); North Anna Power Station, Unit Nos. 1 and 2 (North Anna); Virgil C. Summer Nuclear Station, Unit 1 (V.C. Summer); and Millstone Power Station, Units 1, 2, & 3 (Millstone); as well as the combined license for North Anna Unit 3; and the North Anna Early Site Permit. The application contains sensitive unclassified non-safeguards information (SUNSI).
Ler o resumo →Energia e ambiente · 08/10/2026
A Comissão de Regulação Nuclear dos EUA (NRC) está fornecendo notícias públicas cada semana, por quatro semanas consecutivas, a partir do dia 1 de outubro de 2026, sobre o recebimento e disponibilidade da primeira parte de uma solicitação de autorização de construção em fases, incluindo uma autorização de trabalho limitado (LWA), de SMR, LLC, a nome de Palisades SMR, LLC, uma subsidiária totalmente detida da Holtec International (coletivamente, Holtec), para uma unidade nuclear SMR-300 dupla localizada no Centro de Energia Palisades (PEC) em Covert, Michigan.
Ler o resumo →Energia e ambiente · 01/10/2026
A Comissão de Regulação Nuclear dos EUA (NRC) está fornecendo notícias públicas cada semana, por quatro semanas consecutivas, a partir do dia 1 de outubro de 2026, sobre o recebimento e disponibilidade da primeira parte de uma solicitação de permissão de construção em fase, incluindo uma autorização de trabalho limitado (LWA), de SMR, LLC, a nome de Palisades SMR, LLC, uma subsidiária totalmente detida da Holtec International (coletivamente, Holtec), para um reator SMR-300 duplo unidade localizado na Central de Energia Palisades (PEC) em Covert, Michigan.
Ler o resumo →