BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

에너지 및 환경 · 1994. 11. 14.1 분 읽기

Notice of Availability of Record of Decision for the Coyote Springs Cogeneration Project

로컬 자동 번역 · 원본 출처 언어

요약

Today's notice announces the availability of the ROD to authorize the use of the Federal Columbia River Transmission System (FCRTS) to transmit power from Unit 1 of Portland General Electric's (PGE) proposed Coyote Springs Cogeneration Plant to the Portland Metropolitan Area, relying on the analysis in the Coyote Springs Cogeneration Project Environmental Impact Statement (EIS). This decision would be achieved by building the proposed transmission facilities that are required to interconnect the proposed plant with the FCRTS and by revising the general transmission agreement with PGE to establish Coyote springs as a point of interconnection for wheeling services.

원본 출처 언어: Federal Register — Energy Department원문 발표 열기 →