BN Business News
기업 추가 →
이 기사의 번역을 준비하고 있습니다. 그동안 영어 원문을 임시로 표시합니다.

국제 무역 · 2016. 5. 12.1 분 읽기

Notice of Availability of the Draft Environmental Impact Report/Environmental Impact Statement for the Otay Mesa Conveyance and Disinfection System Project, San Diego County, California, Presidential Permit Application Review

로컬 자동 번역 · 원본 출처 언어

요약

The U.S. Department of State (Department) announces availability for public review and comment of the Draft Environmental Impact Report/Environmental Impact Statement for the Otay Mesa Conveyance and Disinfection System Project, San Diego County, California Presidential Permit Application Review (Draft EIR/EIS). This document analyzes the potential environmental effects of issuing a Presidential Permit to the Otay Water District (District) for the construction, connection, operation, and maintenance of transboundary pipeline facilities for the importation of desalinated seawater from Mexico to the United States in San Diego County, California (Otay Water Pipeline). The Draft EIS/EIR was prepared consistent with the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. Sec. 4321, et seq.), the regulations of the Council on Environmental Quality (CEQ) (40 CFR 1500-1508), and the Department's implementing regulations (22 CFR part 161), and pursuant to the California Environmental Quality Act (CEQA) of 1970. It evaluates the potential environmental impacts of issuing a Presidential Permit to the District to construct, connect, operate, and maintain an approximately four-mile-long

원본 출처 언어: Federal Register — State Department원문 발표 열기 →