BN Business News
会社を追加 →
この記事の翻訳を準備しています。それまでの間、英語の原文を表示します。

規制と法律 · 2024/12/21 分で読めます

Notice of Final Federal Agency Actions on Transportation Project in Washington State

ローカル自動翻訳 · 情報源の原言語

概要

This notice announces actions taken by the FHWA that are final. The action relates to the SR 3 Freight Corridor--New Alignment project, located in western Washington within the City of Bremerton, Kitsap County, and Mason County. The Project will construct the SR 3 Freight Corridor--New Alignment to the east of the existing SR3 with a design and posted speed of 50 miles per hour. The proposed alignment will begin at MP 22.81 on existing SR 3 and connect back to the existing SR 3 alignment at MP 29.49. The project includes stormwater treatment facilities, 12-foot lanes with 8-foot shoulders, and roundabouts at the north and south connections to existing SR 3. The FHWA's Finding of No Significant Impact (FONSI) provides details on the Selected Alternative for the proposed improvements.

情報源の原言語: Federal Register — All Documents原文の発表を開く →

関連インサイト

ビジネスインサイト →