BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Réglementation et droit · 02/12/20241 min de lecture

Notice of Final Federal Agency Actions on Transportation Project in Washington State

Traduction automatique locale · Langue originale de la source

Résumé

This notice announces actions taken by the FHWA that are final. The action relates to the SR 3 Freight Corridor--New Alignment project, located in western Washington within the City of Bremerton, Kitsap County, and Mason County. The Project will construct the SR 3 Freight Corridor--New Alignment to the east of the existing SR3 with a design and posted speed of 50 miles per hour. The proposed alignment will begin at MP 22.81 on existing SR 3 and connect back to the existing SR 3 alignment at MP 29.49. The project includes stormwater treatment facilities, 12-foot lanes with 8-foot shoulders, and roundabouts at the north and south connections to existing SR 3. The FHWA's Finding of No Significant Impact (FONSI) provides details on the Selected Alternative for the proposed improvements.

Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →

Explorer les analyses

Analyses business →