BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Regulación y derecho · 2/12/20241 min de lectura

Notice of Final Federal Agency Actions on Transportation Project in Washington State

Traducción automática local · Idioma original de la fuente

Resumen

This notice announces actions taken by the FHWA that are final. The action relates to the SR 3 Freight Corridor--New Alignment project, located in western Washington within the City of Bremerton, Kitsap County, and Mason County. The Project will construct the SR 3 Freight Corridor--New Alignment to the east of the existing SR3 with a design and posted speed of 50 miles per hour. The proposed alignment will begin at MP 22.81 on existing SR 3 and connect back to the existing SR 3 alignment at MP 29.49. The project includes stormwater treatment facilities, 12-foot lanes with 8-foot shoulders, and roundabouts at the north and south connections to existing SR 3. The FHWA's Finding of No Significant Impact (FONSI) provides details on the Selected Alternative for the proposed improvements.

Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →