BN Business News
Aggiungi la tua azienda →
Questa traduzione è in preparazione. Nel frattempo mostriamo temporaneamente la versione originale in inglese.

Commercio internazionale · 09/05/20161 min di lettura

Notice of Availability of the Draft Environmental Assessment and Preliminary Finding of No Significant Impact for the NuStar Burgos Pipelines Presidential Permit Applications Review, Hidalgo County, Texas

Traduzione automatica locale · Lingua originale della fonte

Riepilogo

The U.S. Department of State (Department) announces availability for public review and comment of the Draft Environmental Assessment (Draft EA) and the Preliminary Finding of No Significant Impact for the NuStar Burgos Pipelines Presidential Permit Applications Review (Preliminary FONSI). These documents evaluate the potential environmental impacts of issuing Presidential Permits to NuStar Logistics, L.P. (NuStar) to authorize in Hidalgo County, Texas: The construction, connection, operation, and maintenance of a proposed new NuStar Burgos pipeline (New Burgos Pipeline); a proposed change in petroleum products for an existing Burgos pipeline (Existing Burgos Pipeline), for which a Presidential Permit was issued in 2006; and a name change of the owner and operator of the Existing Burgos Pipeline. The Draft EA and Preliminary FONSI were prepared consistent with the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. Sec. 4321, et seq.), the regulations of the Council on Environmental Quality (CEQ) (40 CFR 1500-1508), and the Department's implementing regulations (22 CFR part 161).

Lingua originale della fonte: Federal Register — State DepartmentApri il comunicato originale →

Esplora gli approfondimenti

Analisi aziendali →