BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Commerce international · 09/05/20161 min de lecture

Notice of Availability of the Draft Environmental Assessment and Preliminary Finding of No Significant Impact for the NuStar Burgos Pipelines Presidential Permit Applications Review, Hidalgo County, Texas

Traduction automatique locale · Langue originale de la source

Résumé

The U.S. Department of State (Department) announces availability for public review and comment of the Draft Environmental Assessment (Draft EA) and the Preliminary Finding of No Significant Impact for the NuStar Burgos Pipelines Presidential Permit Applications Review (Preliminary FONSI). These documents evaluate the potential environmental impacts of issuing Presidential Permits to NuStar Logistics, L.P. (NuStar) to authorize in Hidalgo County, Texas: The construction, connection, operation, and maintenance of a proposed new NuStar Burgos pipeline (New Burgos Pipeline); a proposed change in petroleum products for an existing Burgos pipeline (Existing Burgos Pipeline), for which a Presidential Permit was issued in 2006; and a name change of the owner and operator of the Existing Burgos Pipeline. The Draft EA and Preliminary FONSI were prepared consistent with the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. Sec. 4321, et seq.), the regulations of the Council on Environmental Quality (CEQ) (40 CFR 1500-1508), and the Department's implementing regulations (22 CFR part 161).

Langue originale de la source: Federal Register — State DepartmentOuvrir le communiqué original →

Explorer les analyses

Analyses business →