BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Comercio internacional · 9/5/20161 min de lectura

Notice of Availability of the Draft Environmental Assessment and Preliminary Finding of No Significant Impact for the NuStar Burgos Pipelines Presidential Permit Applications Review, Hidalgo County, Texas

Traducción automática local · Idioma original de la fuente

Resumen

The U.S. Department of State (Department) announces availability for public review and comment of the Draft Environmental Assessment (Draft EA) and the Preliminary Finding of No Significant Impact for the NuStar Burgos Pipelines Presidential Permit Applications Review (Preliminary FONSI). These documents evaluate the potential environmental impacts of issuing Presidential Permits to NuStar Logistics, L.P. (NuStar) to authorize in Hidalgo County, Texas: The construction, connection, operation, and maintenance of a proposed new NuStar Burgos pipeline (New Burgos Pipeline); a proposed change in petroleum products for an existing Burgos pipeline (Existing Burgos Pipeline), for which a Presidential Permit was issued in 2006; and a name change of the owner and operator of the Existing Burgos Pipeline. The Draft EA and Preliminary FONSI were prepared consistent with the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. Sec. 4321, et seq.), the regulations of the Council on Environmental Quality (CEQ) (40 CFR 1500-1508), and the Department's implementing regulations (22 CFR part 161).

Idioma original de la fuente: Federal Register — State DepartmentAbrir el comunicado original →