BN Business News
Ajouter votre entreprise →
Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.

Entreprise · 02/11/20111 min de lecture

Basin Electric Power Cooperative, Inc.: Notice of Intent To Prepare an Environmental Impact Statement and Hold Public Scoping Meetings

Traduction automatique locale · Langue originale de la source

Résumé

The Rural Utilities Service (RUS), an agency within the U.S. Department of Agriculture (USDA), intends to prepare an environmental impact statement (EIS) for Basin Electric Power Cooperative's (Basin Electric) proposed Antelope Valley Station (AVS) to Neset Transmission Project (Project) in North Dakota. RUS is issuing this Notice of Intent (NOI) to inform the public and interested parties about the proposed Project, conduct a public scoping process, and invite the public to comment on the scope, proposed action, and other issues to be addressed in the EIS. The EIS will address the construction, operation, and maintenance of Basin Electric's proposed Project. The Project includes construction, operation and maintenance of approximately 190 miles of new 345-kV single pole transmission line and double circuit 345/115-kV transmission lines, 2 new substations, modifications to 4 existing substations, a 345-kV switchyard, maintenance access roads, temporary construction roads, river crossings, temporary construction staging sites, and other facilities to be described in the proposed EIS. Basin Electric's proposed Project would be located in portions of Billings, Dunn, McKenzie, Mercer,

Langue originale de la source: Federal Register — Agriculture DepartmentOuvrir le communiqué original →