BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2026/7/231 分钟阅读

Public Land Order No. 7970; Extension of Public Land Order No. 7668, Utah Lake Drainage Basin and Diamond Fork Systems, Bonneville Unit of the Central Utah Project, Utah

本地自动翻译 · 来源原始语言

摘要

This Public Land Order (PLO) extends, for an additional 20- year term, the withdrawal established by PLO No. 7668, which would otherwise expire on July 26, 2026. The extension is necessary to prevent uses that could conflict with the operation of the Utah Lake Drainage Basin and Diamond Fork Systems, Bonneville Unit of the Central Utah Project, which supports Utah's irrigation, municipal, industrial, hydroelectric, conservation, and recreation needs. The lands have been, and will remain, open to mineral leasing and to all other uses legally authorized on National Forest System lands.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →