Cette traduction est en cours de préparation. En attendant, nous affichons temporairement la version originale en anglais.
Réglementation et droit · 23/07/20261 min de lecture
Public Land Order No. 7970; Extension of Public Land Order No. 7668, Utah Lake Drainage Basin and Diamond Fork Systems, Bonneville Unit of the Central Utah Project, Utah
Traduction automatique locale · Langue originale de la source
Résumé
This Public Land Order (PLO) extends, for an additional 20- year term, the withdrawal established by PLO No. 7668, which would otherwise expire on July 26, 2026. The extension is necessary to prevent uses that could conflict with the operation of the Utah Lake Drainage Basin and Diamond Fork Systems, Bonneville Unit of the Central Utah Project, which supports Utah's irrigation, municipal, industrial, hydroelectric, conservation, and recreation needs. The lands have been, and will remain, open to mineral leasing and to all other uses legally authorized on National Forest System lands.
Langue originale de la source: Federal Register — All DocumentsOuvrir le communiqué original →