BN Business News
添加企业 →
本文翻译正在准备中。在此之前,我们暂时显示英文原文。

监管与法律 · 2025/9/221 分钟阅读

Notice of Final Nonavailability Waiver of Buy American Act Requirements: Port of Corpus Christi Authority To Purchase Marine Loading Arms

本地自动翻译 · 来源原始语言

摘要

MARAD is issuing a limited waiver of the Buy American Act requirements for non-domestic marine loading arms for the Port of Corpus Christi Authority's (PCCA) Avery Point Public Oil Docks Redevelopment--Phase 1: Expanding Oil Dock 3 project, which received funding under the FY 2019 Port Infrastructure Development Program (PIDP). The Buy American Act requires that manufactured articles, materials, or supplies be manufactured in the United States substantially all from articles, materials, or supplies mined, produced, or manufactured in the United States. The final waiver applies only to the procurement of eight non-domestic 8-inch diameter manually operated marine loading arms based on nonavailability.

来源原始语言: Federal Register — All Documents打开原始公告 →

探索专题

商业洞察 →