BN Business News
Añadir empresa →
Esta traducción se está preparando. Mientras tanto, mostramos temporalmente la versión original en inglés.

Regulación y derecho · 22/9/20251 min de lectura

Notice of Final Nonavailability Waiver of Buy American Act Requirements: Port of Corpus Christi Authority To Purchase Marine Loading Arms

Traducción automática local · Idioma original de la fuente

Resumen

MARAD is issuing a limited waiver of the Buy American Act requirements for non-domestic marine loading arms for the Port of Corpus Christi Authority's (PCCA) Avery Point Public Oil Docks Redevelopment--Phase 1: Expanding Oil Dock 3 project, which received funding under the FY 2019 Port Infrastructure Development Program (PIDP). The Buy American Act requires that manufactured articles, materials, or supplies be manufactured in the United States substantially all from articles, materials, or supplies mined, produced, or manufactured in the United States. The final waiver applies only to the procurement of eight non-domestic 8-inch diameter manually operated marine loading arms based on nonavailability.

Idioma original de la fuente: Federal Register — All DocumentsAbrir el comunicado original →